AI-assisted story organization

Plan books and scripts scene by scene

Turn a large draft into a visual story map. Arrange chapters, scenes, notes, and rewrite decisions in one clear workspace from first outline to final pass.

Built for large writing projects

Long-form writers
Book projects
Script rewrites
Scene planning
Write faster, plan cleaner

Powerful featuresfor organized storytelling

Move through complex drafts faster by keeping structure, scenes, chapters, and rewrite decisions visible.

Story Structure

Break large ideas into ordered chapters, scenes, sections, and narration blocks before the draft gets messy.

Rewrite Momentum

Move through rewrites faster while keeping meaning, tone, and story intent visible.

Scene & Chapter Flow

Arrange scenes, beats, chapters, and supporting notes so the full story stays easy to scan.

Organized Output

Turn scattered material into a clean writing map for books, scripts, narration, films, or creative work.

Structure-aware prompt context

Built-in toolsfor every long draft

Prepare ideas, edits, and structure notes without separating the story from the working draft.

Write smarter, not harder

Smarter organization for scripts, books, and scenes

Arrange chapters, scenes, beats, and notes in one place
Compare rewrite ideas without losing the original intent
Keep long scripts, books, and narration projects easy to navigate
Open workspace
StoryMynd visual artboard with connected scene cards and narration
StoryMynd scene editor with storyboard navigation and visual beat controls
Built for long projects

Keep every draft clean, reliable, and visible

From book chapters to screenplay scenes, StoryMynd helps teams plan, revise, and move large ideas forward without losing the thread.

Write anywhere, anytime

Story organizationthat works everywhere

StoryMynd project dashboard with scene, section, and sentence metrics
LLM-ready, organized structure

Ready-made workflowsfor every use case

Build outlines, scripts, books, narration, and scenes in a workspace designed for long projects.

A long draft arranged into a connected scene-by-scene story map

Structured Drafting

Turn scattered notes into a connected project map, then work through chapters, scenes, and rewrites with context still attached.

Move faster while keeping the story shape visible.

Cleaner flow

See what each section does before you rewrite, rearrange, or expand the draft.

A workflow that stays understandable

From idea to draftin a clear sequence

Organize high-volume story material before the writing process becomes hard to manage.

01

Import material

Bring in notes, chapters, scripts, outlines, or rough narration ideas.

02

Arrange the structure

Sort story beats into a clear map before rewriting or expanding.

03

Rewrite with context

Improve wording and flow while keeping the original intent visible.

04

Finish cleaner

Move faster from scattered material to a draft that is ready to share.

Designed around the work

Two practical waysto use the workspace

Start with the writing problem in front of you. Keep only the structure that helps you make the next decision.

01

Map chapters and scenes, then rearrange the sequence before structural changes become expensive prose edits.

Novel planning
02

Keep the current scene order and rewrite decisions visible while you work through focused revision passes.

Script rewrites
One project map

Keep the moving piecesin view

Drafts
Scenes
Research
Outlines
Rewrites
Assets
Free planning guides

Practical methodsfor difficult drafts

Use the templates and checklists now, then bring the method into StoryMynd when you need a visual workspace.

Simple, scalable pricing

Plans that fit yourwriting needs

Simple planning tools for writers, teams, and larger story production workflows.

Starter

For individual writers creating a free account

Free
What is included:
Registered free workspace
One saved story project
Up to three scenes
Basic rewrite notes
Create free account

Production

For teams and production workflows

Contact us
What is included:
Workflow discovery call
Team requirements review
Custom scope proposal
Implementation planning
Contact team
Visible planning discipline

Move from scattered ideasto a clear story map

Keep the shape of the project visible so every rewrite has context.

1Unified writing map
AllScripts, books, scenes
FastRewrite passes
ClearProject handoff
Got questions?

We haveanswers

Everything you need to know before opening the StoryMynd workspace.

What does StoryMynd help organize?

It helps writers arrange scripts, books, narration, scenes, chapters, and supporting notes into a clear structure that is easier to rewrite and finish.

Can it help with rewrites?

Yes. Rewrite work stays connected to the source material, so you can explore stronger wording, structure, and flow without losing the original intent.

Is this only for scripts?

No. StoryMynd is useful for any large writing project that needs structure, including books, films, scripts, narrations, scenes, and story outlines.

Can teams use it together?

Starter and Studio are currently designed around individual accounts. Contact us to discuss a Production workflow before relying on StoryMynd for a team process.

What can I export from a project?

Export options depend on the workspace feature and plan. Contact us before purchasing if your workflow requires a particular file format or production handoff.

Still have questions?

Need help? The StoryMynd team can help you plan the right workflow for your draft.

Ready for cleaner drafts?

Start building story plansthat stay organized

Open the workspace, bring in your material, and turn a large draft into a structured story plan.